Saturday, 18 January 2014

Work resumes after a week of record temperatures in Melbourne

And here is our first post for 2014. The weather last week was absolutely awful - 43 degrees C 4 days in a row, and overnight temperature only going down to 27 degrees which made it so hard to sleep let alone work outdoors. Even so, there was some progress :

  • Hebel was delivered although a few panels were damaged
  • ground floor was wrapped and the supports that the Hebel will be attached to were put up
  • roof over master bedroom 
  • frame upstairs around the top of the stairs 
Will be interesting to see how much progress is made when work resumes tomorrow.


some of the delivered Hebel, plus the wrapped wall with our master bedroom at the front, showing the supports


upstairs frame
 
roof over our master bedroom


Back wrapped