Upstairs Hebel looking good

Visited after work today. Looks like the Hebel is 95% done. Went a little overboard with the photos but I'll never get to stand outside upstairs again!

 looking from the front right of the house upstairs past the shower window, then bathroom window looking north
this is upstairs, namely the front of the house, which is what you'll see from the street

 from inside the garage looking up, window on the left is the shower, next double window the bathroom (bottom one will have film on it), then the toilet window followed by the highlight window in the leisure room. The green downstairs is the wrapping of the door from the 2 car garage into the laundry. The blue is the wall of the garage for car no. 3
 looking at the highlight window above the kitchen in the leisure room. We won't be able to see that angle once the downstairs roof over the kitchen/dining room/lounge is in place (will be done once upstairs Hebel is in place).
the sliding door in the picture is the dining room, this wall faces north. the upstairs window is in the leisure room. The only Hebel upstairs remaining to be done is where the green is showing.

What really hit me tonight is how dark the room at the back might be. Maybe it's because of the time of day we were there, but that whole room doesn't look that light, despite the kitchen window splashback, 3 narrow windows in the east wall, the 2 windows in the north wall (ie the sliding door you can see) and the highlight window just in frame of the photo on the right, and the 3 stacker door in the west wall. Time will tell...

I didn't see any retaining wall: maybe that will happen tomorrow. The pillar is of the northern strut of the al fresco.

that's it. most pleasing to see how much Hebel was put up this week. looking forward to Rod's call tomorrow afternoon.....

Monday, 27 January 2014

All set for Hebel upstairs

Haven't visited since last Monday. Downstairs Hebel looks nearly all complete, and scaffolding is now up in readiness for upstairs Hebel....




Carter Grange called Friday. The sarsen gloss laminex we'd chosen for bathroom/laundry is no longer available. Were we available Saturday to decide on a replacement? With Garry in Canberra for Megan's softball competition the answer was no. So we are booked in for next Saturday. But whatever we choose has to match with the floor tiles and vanity tiles... hope a matching colour is available.  We'll know next Saturday.

Once again thanks to James for his suggestion to remember to allow for power for the door bell.

We looked at letterboxes last week. Not impressed so further searching required. We did however find the right clothesline - a rotary that is removable. Perfect :) the only decision will be, will it go in the back corner where it used to be, a superb position but viewable from the dining room ie north east where it catches the breeze? Or, closer to the laundry door near the butler's pantry so no one can see it? Decisions decisions....

Thursday, 23 January 2014

Ground floor with Hebel

went round to the house on Monday after work, what great progress! lots of Hebel....
view from the street to the alfresco

the front door on the left, garage on the right

master bedroom, porch and garage

Hebel around the laundry door

the small window on the left is the 'splashback' in the kitchen, then 3 floor to ceiling windows


view from the back fence line 

view from the front door showing the lovely wide hallway, where the stairs will rise from the back  

and view from the street.

not bad for one day's work :)

Saturday, 18 January 2014

Work resumes after a week of record temperatures in Melbourne

And here is our first post for 2014. The weather last week was absolutely awful - 43 degrees C 4 days in a row, and overnight temperature only going down to 27 degrees which made it so hard to sleep let alone work outdoors. Even so, there was some progress :

  • Hebel was delivered although a few panels were damaged
  • ground floor was wrapped and the supports that the Hebel will be attached to were put up
  • roof over master bedroom 
  • frame upstairs around the top of the stairs 
Will be interesting to see how much progress is made when work resumes tomorrow.


some of the delivered Hebel, plus the wrapped wall with our master bedroom at the front, showing the supports


upstairs frame
 
roof over our master bedroom


Back wrapped